Leveraging Commercial Communication Satellites to Support the Space Situational Awareness Mission Area

Timothy Deaver (Americom Government Systems)

Keywords: SSA, SSA Architecture

Abstract:

The majority of USSTRATCOM detect and track requirements in the geosynchronous regime could be met via strategic placement of medium grade optical sensors on select geosynchronous satellites at relatively low cost in less than 48 months. An architecture which includes hosting SSA sensors on eight to ten commercial communication satellites could provide for highly accurate, timely and relatively inexpensive detect and track capabilities. The major factors considered when hosting any sensor on a commercial communications satellite are size, weight (mass) and power or SWAP. Additional sensor specific items must also be considered to form a complete feasibility analysis. These include data rate, mounting constraints, thermal balance, timing accuracy, and attitude stability requirements. All of these factors directly impact the cost and flexibility of hosting such a sensor on a geosynchronous communication satellite. By choosing a relatively light weight, low power consumption sensor which requires a small amount of bandwidth to transmit its data, the cost of hosting the sensor is kept to a minimum. Once the type of sensor or sensors is identified, the next step is to identify idea geosynchronous locations for the “hosted” sensors. Once these locations are identified, then one would identify a potential host which needs to be replaced within the desired timeframe. Once the host is identified, then the satellite owner / operator should be approached about hosting a “neighborhood” watch sensor aboard their spacecraft. Commercial satellites are routinely replaced based on age, lack of available station keeping fuel or to allow a service provider to upgrade its capabilities. Each commercial communication satellite operator maintains a plan of replacing spacecraft. Between the two largest commercial SATCOM providers, INTELSAT and SES, six to eight spacecraft will be replaced each year (100 plus spacecraft with 15 year average lifetimes). The satellites are usually procured, designed, built, launched and operational within 36 months. In order for the US Government to adapt to this timeline, a sensor specification would need to be established as well as a sensor procurement pipeline. The sensors would then be provided to the satellite bus manufacturer for integration onto the bus. The spacecraft would then be launched and operated by the commercial SATCOM operator for the life of the spacecraft. Based on this approach, it is highly conceivable that a complete geosynchronous “neighborhood” watch program could be completed within 48 months of initiation.

Date of Conference: September 16-19, 2008

Track: SSA & SSA Architecture

View Paper